The AC worked for the last tenant. Why is it uncomfortable now?
The current use may differ in occupancy, hours, room layout or equipment heat, and the system could also have developed a fault. Compare those changes before choosing a solution. A useful review separates repairable problems from changes required to serve the new activity.
Does an air conditioner running all day mean it is too small?
Not by itself. Equipment condition, control settings, air delivery and current loads all need review. Tell the technician whether the rooms reach a comfortable condition and when the pattern began. A capacity proposal should follow findings, rather than rely only on how often the unit runs.
Can a mini-split fix a room created by a new partition?
It may be one option, but the new room still needs a proper layout and load review. Compare the indoor location, outdoor and drain routes, controls and electrical needs. Ask whether improving the existing distribution could address the problem before assuming another unit is the only solution.
Can regular AC service solve workshop exhaust or kitchen ventilation problems?
Those need a separate scope review. Explain the activity, the equipment involved and the symptom you want resolved. A comfort-cooling visit can assess the relevant HVAC equipment, but it does not automatically include process extraction, kitchen exhaust or refrigeration work. The proposal should name any specialist coordination.
Can HVAC work be planned while a Bushwick business stays open?
The project can be discussed around operating needs, but the required shutdown depends on the equipment and work. Name which rooms must remain usable and which activities can pause. A staged plan should state the affected areas and shutdowns; it should not assume there will be no disruption.