A street address is only the beginning of the access plan
Provide the service entrance and the person who can arrange entry to the occupied space, mechanical room and any other equipment location. Ask management about contractor registration, insurance documentation, escorts and freight reservations. These requirements are property-specific; no single Financial District rule describes them all.
For replacement planning, check the equipment route beyond the loading point. Door widths, elevator capacity, corridor turns and access panels can change the practical method. Establish whether a delivery window and a work window are the same appointment. That detail can matter when the equipment must be received first but the actual changeover depends on the building engineer and tenant representatives attending later.