Turn the discussion into owned improvements
EPA’s exercise-design guidance links objectives, facilitation, documentation and improvement planning. Apply that structure to a short action register. For each gap, record the finding, owner, due date and evidence that will close it. An outdated contact can be resolved with an approved directory update; an uncertain capacity basis needs a different technical deliverable.
Circulate the record through the site’s normal approval process. Track unresolved items rather than declaring the site resilient because the meeting went smoothly. Repeat the relevant discussion after material staffing, IT or cooling changes. A proposed functional test needs separate authorization and qualified planning. It also needs operating limits, abort authority and an approved recovery method. This guide does not supply that procedure.