Does an air curtain replace make-up air?
No. Make-up air replaces air removed by exhaust or another building process; an air curtain manages an opening with a directed air stream. If a draft reflects an unbalanced building air system, that concern may require separate ventilation work. The two systems should be assessed for their different jobs.
Can an air curtain stop every cold draft?
No universal result can be promised. Opening geometry, mounting, wind, traffic and building conditions all matter. The assessment should define the intended application and any limitations before recommending repair or replacement. A continuing draft may warrant a broader building-air review.
Should I choose a heated air curtain?
That depends on the doorway application, desired comfort and available services. Heating changes the equipment and installation requirements; it does not remove the need for suitable coverage and mounting. Discuss the actual opening and operating pattern before treating heated equipment as a standard upgrade.
Why does the air curtain run when the door is closed?
Its installed control sequence may allow that behavior, or a control issue may exist. Record what the unit does and which controller is installed. The technician should compare the observed operation with the intended sequence before deciding that a door switch, timer or other component has failed.
Does air-curtain maintenance include the automatic door?
Not automatically. The door operator, switch interface and air curtain may have different providers. Identify who maintains each part and who can authorize interface changes. The service proposal should describe any coordination needed without representing unrelated door-system work as included.
What is needed for an installation estimate?
Provide opening dimensions, door-use pattern, existing unit details if any, mounting photographs from floor level and available electrical information. Add access restrictions and planned entrance changes. The installer still needs to confirm the application and attachment method before a final scope can be accepted.