CONFIGURATION AND HEAT-PATH EVIDENCE

Does Direct-to-Chip Cooling Eliminate Room Air Cooling?

The useful question is how much heat each selected configuration sends along each path, and where that heat goes next. The words “liquid cooled” cannot answer it.

Airplex Mechanical resources Reviewed November 16, 2026

Start here

Does direct-to-chip cooling remove the room’s air-cooling duty?

Not necessarily. Direct-to-chip cooling can leave a substantial air-cooling duty. The result depends on the exact IT configuration, components served by liquid, equipment that remains air cooled and where the liquid system rejects heat. Obtain configuration-specific vendor evidence and account for each path separately. A liquid heat-capture percentage is not, by itself, a basis for reducing or retiring room cooling.

Ask what the percentage actually covers

Lenovo’s Neptune Direct Water-Cooling Standards describes configurations that retain an air-cooling requirement. Its examples attach heat extraction to particular equipment arrangements. They establish that residual duty exists; their percentages are not a default for every direct-to-chip server.

For the proposed purchase, request the full configuration identifier, the covered components, the operating condition and the definition of the reported heat split. Ask whether the denominator is component power, server input or a complete rack. A percentage with an unclear denominator is not ready to multiply by the room’s electrical load.

Keep evidence types separate. A vendor selection document, a design assumption and an operating measurement answer different questions. Record which one you have, its revision or time period, and whether the technical reviewer considers it applicable to the proposed state.

References: [1]

Follow the heat beyond the cold plate

The conceptual paths below show the distinction between collecting heat and removing it from the room. The Open Compute Project (OCP) liquid-distribution guidance describes technology and facility interfaces, including the coolant distribution unit (CDU). The selected project documents must identify the actual arrangement.

For a liquid-to-liquid arrangement, the reviewer needs evidence for the facility receiving path. CoolIT’s AHx180 product documentation provides an example of the alternative: a liquid-to-air CDU that sends captured heat into data-center air. If a proposed unit rejects into this same room, that heat still enters the room-air balance. Ask the supplier to confirm the discharge location and treatment of equipment losses before assigning a room-load reduction.

Conceptual annotated heat-path diagram; arrows show heat movement, not pipe routing or a construction design
Heat originCollection pathReceiving pathEvidence to attach
Covered IT componentsCold plates → technology liquidLiquid-to-liquid CDU → facility system → heat rejectionConfiguration heat split and confirmed receiving-system boundary
IT components outside the liquid pathComponent heat → rack airRoom or other documented air-cooling pathVendor air-side requirement for the selected configuration
Unconverted servers / network equipmentEquipment heat → airExisting documented air-cooling pathEquipment list and consistent load basis
Alternative CDU rejecting into this roomTechnology liquid → liquid-to-air CDUHeat returns to room airCDU architecture, discharge location and losses

References: [2] [3]

Worked example: allocate the same load once

Assume a fictional group of four racks, each using 60 kW at the stated condition. For this example only, assume configuration-specific evidence assigns 45 kW per rack to liquid and 15 kW to air. The remaining air-cooled IT contributes 30 kW on the same load basis. These are invented teaching values, not typical capture fractions or Airplex results.

The four racks total 240 kW. Their liquid allocation is 4 × 45 = 180 kW; their air allocation is 4 × 15 = 60 kW. Adding the other IT gives 90 kW assigned to air and 180 kW assigned to liquid, accounting for the same 270 kW of IT input once.

If the 180 kW liquid path transfers to a facility system outside this room-air boundary, the example leaves 90 kW of identified IT air duty. If that liquid path instead rejects into the same room, the identified IT contribution to room air becomes 270 kW. CDU losses and other room gains remain separate, unquantified items in both cases.

Neither result is a room-cooling equipment selection. The example omits other gains, operating ranges, the spatial distribution of heat and the project’s availability requirements. Its purpose is to show why the same captured heat cannot be subtracted from the room and then forgotten at its discharge point.

Illustrative allocation with a facility liquid receiving path; kW denotes heat rate
Equipment groupTotal input basisAssigned to liquidAssigned directly to air
Four selected racks4 × 60 = 240 kW4 × 45 = 180 kW4 × 15 = 60 kW
Other air-cooled IT30 kW0 kW30 kW
Identified IT total270 kW180 kW90 kW
CDU losses and other room gainsNot quantifiedTo be assignedTo be assigned

Keep an unknown separate from a zero

If the supplier has not supplied the air-side requirement for a configuration, mark its allocation unresolved. Do not fill the cell using a percentage from another model. Likewise, a missing entry for network equipment or room-located losses is a question to close, not evidence that the contribution is zero.

Review whether figures describe the same condition. Mixing one rack’s maximum input with another rack’s measured average creates a total with an unclear meaning. Use a consistent basis or label the mismatch so the reviewer can resolve it.

A useful completed record shows the allocation, the source and the receiving path on one row. Where the row remains incomplete, name the document or supplier response needed. This makes the uncertainty specific enough to act on.

Use the allocation to frame the next review

Send the completed evidence record to the team responsible for the room’s cooling assessment. Ask which duties remain in each operating state and which additional information is needed to assess the air system. A total in kW does not describe where the remaining air-cooled components are located or how their air reaches them.

For a staged conversion, create a separate record for the mixed configuration that will actually operate. Keep the installation sequence in the retrofit phase plan and the heat-allocation evidence here. Any operating change belongs to the site’s authorized technical process; this worksheet provides no instruction to switch off cooling or adjust controls.

Put this guide to work

Residual-air-duty evidence record

Use one row per exact configuration or separate heat source. Enter the operating basis and document revision with each value. Keep unresolved values blank and describe the missing evidence in the last column; do not substitute a generic capture percentage.

Open each item to add your notes, then download the CSV to keep a copy. This tool does not save or submit your entries; do not rely on your browser restoring them.

Selected direct-to-chip configuration
Selected direct-to-chip configuration
Second configuration / rack group
Second configuration / rack group
Unconverted servers
Unconverted servers
Network / storage equipment
Network / storage equipment
CDU losses / discharge boundary
CDU losses / discharge boundary
Other room gains
Other room gains

Continue with a related decision

Questions & answers

Can we apply a published 80% capture figure to the whole room?

Only evidence applicable to the exact equipment and denominator can support that calculation. A figure for selected server components cannot silently become a fraction of all room IT power. Identify the covered configuration, remaining equipment and receiving heat path before building an allocation.

Does adding a rear-door heat exchanger remove every remaining air duty?

The project needs evidence for what the selected arrangement captures and where it rejects that heat. Record the rear-door contribution and its boundary without counting the same heat twice. Other equipment or room gains may remain outside that arrangement; the equipment name alone does not establish the complete result.

Is residual-air duty the same as the total room cooling load?

No. Residual duty refers to heat remaining in an air path after a defined liquid allocation. A complete room assessment also needs the other applicable gains, operating conditions and cooling requirements. Use the existing heat-load resource for total-load context and this record for the evidence behind the split.

Sources & technical references

  1. Lenovo Press LP2018: Lenovo Neptune Direct Water-Cooling Standards

    Published September 13, 2024; configuration examples include residual air duty. Reviewed November 16, 2026. No vendor capture percentage is adopted as a general rule.

  2. OCP: Data Center Liquid Distribution Guidance & Reference Designs

    Revision 1.0, January 8, 2024; technology/facility interfaces. Reviewed November 16, 2026. The heat-allocation diagram and numbers here are original illustrations.

  3. CoolIT Systems: AHx180 liquid-to-air CDU

    Manufacturer description explicitly identifies rejection of captured heat into data-center air. Reviewed November 16, 2026; architecture example only, without adopting product capacity or availability claims.

NYC & Northern New Jersey

Connect the IT evidence to the facility scope

Airplex Mechanical’s Critical Cooling Division can discuss direct-to-chip and facility air-cooling needs in NYC and Northern New Jersey. Bring the configuration, heat-path records and the decision the project team needs to resolve.

Discuss the remaining cooling dutyCall (347) 627-7146
Call Now Request Service