05
Replacement planning includes access throughout the unit’s life
A replacement review should consider the unit’s service clearances and removal path as well as its delivery to the roof. Filters, fans and other components need access after installation. Include nearby equipment, roof circulation and the connections that must remain maintainable. Where a design or structural review is needed, make it an identified project responsibility.
At handover, keep the selected configuration, startup record and sequence with the property documents. Describe the modes actually demonstrated and any seasonal test still outstanding. If a future maintenance contract is proposed, use the installed sections as its equipment schedule. That gives the owner a connection between what was bought, what was tested and what will be maintained.